Home › Project database › China
Grid-scale battery storage projects in China
32 projects · 10,525 MW · 37,305 MWh disclosed. Status: Operating 22, In development 5, Under construction 5.
| Project | Sponsor | Location | Size | Status | Revenue | Financing / lenders | Source |
|---|---|---|---|---|---|---|---|
| Envision Chagan Hada BESS Grid-connected Dec 2025 | Envision | Bayannur, Inner Mongolia | 1,000 MW / 4,000 MWh | Operating | Standalone: spot, ancillary services, capacity compensation and arbitrage; flagship of Envision’s 12.8 GWh Inner Mongolia cluster | Not publicly disclosed | ↗ |
| Dong-Su grid-forming BESS Connected around Aug 2026 | Not publicly disclosed | Inner Mongolia (site not disclosed) | 1,000 MW / 4,000 MWh | Operating | Grid-forming LFP; ~1 TWh expected annual discharge | Total investment ~CNY 3bn | ↗ |
| Lingwu 1,000 MW / 4,000 MWh centralised shared BESS (Baitugang) Not publicly disclosed | 灵武市华新综合能源服务有限公司 (owner); EPC: 武汉天源 consortium | Baitugang Township, Lingwu, Ningxia | 1,000 MW / 4,000 MWh | In development | NPD | NPD | ↗ |
| CHN Energy Lingwu 4 GW PV storage Partly commissioned Feb 2026 | CHN Energy | Lingwu, Ningxia (coal-mining subsidence area) | 600 MW / 1,200 MWh | Under construction | Co-located with PV; 400 MW / 800 MWh commissioned so far | Not publicly disclosed | ↗ |
| Huai’an salt-cavern compressed-air storage Grid-connected Jan 2026 | Jiangsu Guoxin / Suyan | Huai’an, Jiangsu | 600 MW / 2,400 MWh | Operating | Non-battery: 2 × 300 MW adiabatic CAES, ~71% round-trip efficiency | Not publicly disclosed | ↗ |
| Baotou Weijun standalone BESS Grid-connected Dec 2025 | HyperStrong | Tumed Right Banner, Baotou, Inner Mongolia | 500 MW / 3,000 MWh | Operating | Grid-side standalone, 6-hour | Not publicly disclosed | ↗ |
| Tongliao Conch standalone BESS Commissioned Nov 2025 | Anhui Conch | Naiman Banner, Tongliao, Inner Mongolia | 500 MW / 2,000 MWh | Operating | Standalone; CATL 5 MWh systems | Not publicly disclosed | ↗ |
| Ningxia Lingwu Xinfeng 500 MW / 2,000 MWh BESS Not publicly disclosed | Not publicly disclosed (PC contractor: Zhejiang No.3 Construction / Zhejiang Construction Investment consortium) | Lingwu, Ningxia | 500 MW / 2,000 MWh | In development | PC general contract awarded (bid RMB 1.503bn, 365-day construction period); formal contract not yet signed; owner NPD; revenue structure NPD | Financing NPD | ↗ |
| 220kV Boxian Xingguang BESS Grid-connected Dec 2025 | HyperStrong | Inner Mongolia (city not disclosed) | 400 MW / 2,400 MWh | Operating | Grid-forming PCS (Huawei) | Not publicly disclosed | ↗ |
| Fanshi 400 MW / 1,600 MWh grid-forming shared BESS Operating · Oct 2026 (phase 1, 200 MW / 800 MWh) | 未公开 / Not publicly disclosed | Fanshi County, Shanxi (220 kV Huyuan substation) | 400 MW / 1,600 MWh | Operating | Storage-quota leasing + spot arbitrage + frequency/voltage/reserve ancillary services | Total investment CNY 1.6 bn; financing NPD | ↗ |
| Xinneng Yanchi Gaoshawo 320 MW / 640 MWh storage station Grid-connected · Nov 2026 (announced) | 新能股份 (000595.SZ) 控股子公司 | Gaoshawo, Yanchi County, Ningxia | 320 MW / 640 MWh | Operating | Revenue structure NPD | Dynamic total investment RMB 492m; financing NPD | ↗ |
| Ningxia Yongli BESS Grid-connected Jun 2026 | Ningxia Dian Investment | Shapotou District, Zhongwei, Ningxia | 300 MW / 600 MWh | Operating | LFP, 2-hour | Not publicly disclosed | ↗ |
| Jinko Power Shuozhou Jingyuan 300 MW / 600 MWh standalone BESS Construction started · Oct 2026 (COD NPD) | 晶科电力科技股份有限公司 (Jinko Power Technology) | Shendian Solid Waste Utilization Park, Shuozhou Economic Development Zone, Shuozhou, Shanxi | 300 MW / 600 MWh | Under construction | Revenue structure NPD | Financing NPD | ↗ |
| Wuzhou Longxu new-type BESS (Longteng storage station) Grid-connected · Oct 2026 | 深圳易储数智能源集团 (Shenzhen Yichu Shuzhi Energy Group) | Longxu District, Wuzhou, Guangxi | 300 MW / 600 MWh | Operating | Capacity leasing + power trading + ancillary services | Financing NPD | ↗ |
| Shouguang Caiyangzi Shared Storage Project Not publicly disclosed | 寿光保华盈新能源有限公司 | Shouguang, Shandong (220 kV connection to the Three Gorges storage station busbar) | 300 MW / 600 MWh | In development | Revenue structure NPD | Financing NPD | ↗ |
| Xinneng Lingwu Majiatan 240 MW / 480 MWh storage station Grid-connected · Nov 2026 (announced) | 新能股份 (000595.SZ) 控股子公司 | Majiatan, Lingwu, Ningxia | 240 MW / 480 MWh | Operating | Revenue structure NPD | Dynamic total investment RMB 373m; financing NPD | ↗ |
| Ulanqab Jingda wind-solar-thermal-storage base BESS (225 MW / 900 MWh) Not publicly disclosed | Beijing Jingneng Power & GD Power (joint investment) | Fengzhen, Ulanqab, Inner Mongolia | 225 MW / 900 MWh | Under construction | Electrochemical storage within base with 1.2 GW wind and 300 MW solar (1.5 GW total); revenue structure NPD | Base total investment RMB 7.148 bn by Jingneng Power and GD Power; financing NPD | ↗ |
| Wuhai semi-solid-state BESS Grid-connected Nov 2025 | China Green Development | Wuhai, Inner Mongolia | 200 MW / 800 MWh | Operating | Semi-solid-state LFP | Total investment ~CNY 600m | ↗ |
| Huaneng Jimusar vanadium flow storage In operation by Jan 2026 | Huaneng | Jimusar County, Xinjiang | 200 MW / 1,000 MWh | Operating | Paired with 1 GW PV; 5-hour vanadium flow (Rongke Power) | Total investment CNY 3.8bn | ↗ |
| Guangdong storage innovation centre, Shunde Grid-connected Dec 2025 | Guangdong Storage Institute | Shunde, Foshan, Guangdong | 200 MW / 305 MWh | Operating | Supercapacitors 50 MW / 5 MWh + LFP 150 MW / 300 MWh | Not publicly disclosed | ↗ |
| Guozong Lvneng Jinchang 200 MW / 800 MWh grid-side standalone BESS Grid-connected · Oct 2026 | 国综绿能 (Guozong Lvneng) | Xipo PV Industrial Park, Jinchuan District, Jinchang, Gansu | 200 MW / 800 MWh | Operating | Revenue structure NPD | Total investment approx. RMB 780 million; financing NPD | ↗ |
| Sungrow Damaoqi 200MW/800MWh independent new-type storage demonstration plant Construction started Oct 2026 · Full grid connection planned 2027 | 阳光新能源开发股份有限公司 (Sungrow Renewables Development) | Darhan Muminggan (Damao) Banner, Baotou, Inner Mongolia | 200 MW / 800 MWh | Under construction | Revenue structure NPD | Financing NPD | ↗ |
| Datong Hunyuan shared storage station Not publicly disclosed | 未公开 (NPD) | Zhonghan Village, Xiahancun Township, Hunyuan County, Datong, Shanxi | 200 MW | In development | Revenue structure NPD | Total investment RMB 480 million; financing NPD | ↗ |
| Wujiaqu Beitashan GFM BESS Not publicly disclosed | 华夏兴疆(五家渠)新型储能有限公司 | Beitashan Ranch, Wujiaqu City (XPCC 6th Division), Xinjiang | 200 MW / 800 MWh | Under construction | Peak-valley spread, capacity price, ancillary services | Investment over CNY 800m; financing NPD | ↗ |
| Yunda Energy Ulanqab BESS Not publicly disclosed | 运达能源 | Ulanqab, Inner Mongolia | 200 MW / 800 MWh | In development | Revenue structure NPD | Financing NPD | ↗ |
| Pinghu Dushangang 120 MW / 240 MWh grid-side BESS Grid-connected · Oct 2026 | 未公开 (NPD) | Dushangang High-tech Industrial Park, Pinghu, Jiaxing, Zhejiang | 120 MW / 240 MWh | Operating | Revenue structure NPD | Financing NPD | ↗ |
| Huaneng Baotou Tongwei storage Grid-connected May 2026 | Huaneng | Baotou, Inner Mongolia | 90 MW / 360 MWh | Operating | Supports a green-power industrial park | Not publicly disclosed | ↗ |
| Guohua Rudong offshore PV-hydrogen-storage Grid-connected Jun 2026 | Guohua | Yangkou Port, Rudong, Jiangsu | 60 MW / 120 MWh | Operating | Paired with offshore PV | Not publicly disclosed | ↗ |
| CGDG Golmud 60 MW liquid air energy storage demonstration project Grid-connected · Oct 2026 | 中国绿发投资集团有限公司 (China Green Development Investment Group) | Golmud, Qinghai | 60 MW | Operating | NPD | NPD | ↗ |
| Honghu sodium-ion storage (phase I) Phase I grid-connected Jan 2026 | Guangzhou Development | Honghu, Hubei | 50 MW / 100 MWh | Operating | Sodium-ion; 100 MW / 200 MWh planned in total | Not publicly disclosed | ↗ |
| Seda grid-forming storage + renewables microgrid (40 MW / 80 MWh GFM BESS) Operating · Apr 2025 | 国网四川省电力公司、国家电力投资集团 | Seda County, Garzê Prefecture, Sichuan | 40 MW / 80 MWh | Operating | Revenue structure NPD | Financing NPD | ↗ |
| CHN Energy Nagqu Jicuo 100 MW wind-storage project (20 MW / 80 MWh grid-forming BESS) Operating · Nov 2026 | 国家能源集团西藏公司 (CHN Energy Tibet) | Seni District, Nagqu, Tibet | 20 MW / 80 MWh | Operating | Revenue structure NPD | Financing NPD | ↗ |
Disclosed lenders in China
No project financing with a named lender in public sources yet.
Latest China news
- 9 Nov 2026China Green Development connects 60 MW/600 MWh liquid-air storage demonstration project in Golmud, Qinghai
- 6 Nov 2026China's independent storage rush: 64.02% of Jan–Jul procurement, but many plants earn only 3–4%
- 5 Nov 2026Huawei Digital Power tells customers of 5–15% price rises; grid-forming storage and PCS up 5–10%
- 3 Nov 2026Shandong draft ends 2x capacity payments for independent storage and excludes leased capacity
- 3 Nov 2026NEA: China's new-type storage reaches 167 GW/435 GWh by end-September, up 63%
Get the daily brief by email
Free. Daily brief and weekly research report in English, 中文 or 日本語, plus the APAC BESS Lender Map PDF.